Figure 2.21, Figure 2.22 – Hypertherm PAC500 Product Configuration User Manual
Page 55

2-16
PAC-500
PAC-500 System - w/THC-1/RVC, Fluidic IHS and All Options (Ref. Fig. 1.19)
12
12
1
2
3
4
Figure 2.22 Cables / Hoses in Machine Cable/Hose Carrier - THC-1/RVC Fluidic IHS w/Options
7/8"
7/8"
5/8"
5/8"
5/8"
1
2
3
4
5
6
Figure 2.21 Cables / Hoses in Rail - THC-1/RVC, Fluidic IHS w/Options
3
A
PS Leads - PS to Cntrl Csl
7/8" Negative Lead - PS/Cntrl Csl
7/16" Control Cable - PS/Cntrl Csl
8a or 8b Flowmeter or Op Panel Leads -
Flowmeter or Op Panel to Cntrl Csl
1/2" Gas In
1/2" Gas Out
1/2" Inj. Water In
1/2" Inj. Water Out
1/2"* Control Cable (Included with
Op Panel Leads only)
14 or 16 Water Muffler Hose - Water
Muffler Pump to Water Muffler Nozzle
D
Cable - RVC Cntrl Stn to RVC Trnsmtr
G
Gas Supply Hose - Gas Supply to Cntrl Csl
10
Cooling Water Hose Set - Water Supply or
Water Chiller to Cntrl Csl
3d† Negative Lead - PS to Cntrl Csl
(Used in systems delivering more than
500 Amps)
13
Cable - Argon-Hydrogen Csl to Cntrl Csl
A
Cable - THC-1/RVC Module to Torch Lifter
B
Cable - THC-1/RVC Module to N/C Controller
C
Cable - THC-1/RVC Module to IHS
Key - Figure 2.21
G
10
3d† 13 A B C
Key - Figure 2.22
6 Torch Leads -
Control Console to Torch
1-1/2" Shielded Torch Leads
1/2" Gas Lead
1/2" Inj. Water Lead
14 or 16 Water Muffler Hose -
Water Muffler Pump
to Water Muffler Nozzle
1-1/2"
1/2"
1"
1/2"
6 14 or 16
3
A
8a or 8b
14 or 16 D
7/16"
1/2"
1/2"
1/2"*
1/2"
1/2"
1"
3/8"
1/4"
3/8"
3/8"
3/8"