Figure 2.15, Cables / hoses in rail - thc-2 w/options -13, Figure 2.16 – Hypertherm PAC500 Product Configuration User Manual
Page 52

2-13
PAC-500
PAC-500 System - w/THC-2 and All Options (Ref. Fig. 1.16)
12
7/8"
7/8"
G
10
3d†
13
5/8"
5/8"
5/8"
Figure 2.15 Cables / Hoses in Rail - THC-2 w/Options
12
1
2
3
4
Key - Figure 2.16
6 Torch Leads -
Control Console to Torch
1-1/2" Shielded Torch Leads
1/2" Gas Lead
1/2" Inj. Water Lead
14 or 16 Water Muffler Hose -
Water Muffler Pump
to Water Muffler Nozzle
1-1/2"
1/2"
6 14 or 16
Figure 2.16 Cables / Hoses in Machine Cable/Hose Carrier - THC-2 w/Options
1"
1/2"
3
A
PS Leads - PS to Cntrl Csl
7/8" Negative Lead - PS/Cntrl Csl
7/16" Control Cable - PS/Cntrl Csl
8a or 8b Flowmeter or Op Panel Leads -
Flowmeter or Op Panel to Cntrl Csl
1/2" Gas In
1/2" Gas Out
1/2" Inj. Water In
1/2" Inj. Water Out
1/2"* Control Cable (Included with
Op Panel Leads only)
14 or 16 Water Muffler Hose - Water
Muffler Pump to Water Muffler Nozzle
G
Gas Supply Hose - Gas Supply to Cntrl Csl
10
Cooling Water Hose Set - Water Supply or
Water Chiller to Cntrl Csl
3d† Negative Lead - PS to Cntrl Csl
(Used in systems delivering more than
500 Amps)
13
Cable - Argon-Hydrogen Csl to Cntrl Csl
Key - Figure 2.15
3
A
8a or 8b
14 or 16
7/16"
1/2"
1/2"
1/2"*
1/2"
1/2"
1"
1/4"
1
2
3
4