Maintenance schedule, Owner's manual, Page 35 – Hoist Fitness RPL-5405 User Manual
Page 36: Rpl-5405 assembly, Routine, Latest date entry
Cables, Belts and Connecting Parts
Seat Sleeves, Turcite Bushings,
For personal, in home use, please follow the home maintenance schedule listed above.
Your equipment comes with a commercial maintenance decal.
MAINTENANCE
DAILY
DAILY
WEEKLY
WEEKLY
WEEKLY
DAILY
COMMERCIAL
MAINTENANCE
WEEKLY
WEEKLY
WEEKLY
3 MONTHS
3 MONTHS
3 MONTHS
HOME
Upholstery
Clean;
Linear Bearing
Swivels, Weight Stack Pins
ROUTINE
Links, Pull Pins, Snap Locks,
All Decals
Inspect;
Accessory Bars, and Handles
Inspect;
Inspect;
tension
Cables or Belts and their
All Nuts and Bolts, Tighten if needed
Inspect;
WEEKLY
MONTHLY
MONTHLY
YEARLY
6 MONTHS
6 MONTHS
3 MONTHS
3 MONTHS
3 MONTHS
YEARLY
3 YEARS
YEARLY
MAINTENANCE SCHEDULE
Anti-Skid Surface
Inspect;
All Glossy Finishes
Clean and Wax;
Linear Bearings
Repack with Grease;
Inspect;
based lubricant (Superlube)
Guide Rods with a Teflon (PTFE)
Clean & Lubricate;
Lubricate;
Replace;
LATEST DATE ENTRY
PAGE 35
OWNER'S MANUAL
RPL-5405 ASSEMBLY