beautypg.com

Greenheck ERV-522/90 Curbs (460988) User Manual

Page 3

background image

3

STEP 3: Fastening Inner Cross and Outer Duct Channel (Items 6 & 8)

Hardware Required: (8) Screws, SMS (A) 12 x 0.625 (IHH)

(1) Inner Cross Channel

(1) Outer Duct Channel

Instructions: • Position the Outer Duct

Channel as depicted.

• Align the holes and fasten

using (4) 12 x 0.625 (IHH)
screws.

• Position the Inner Cross

Channel as depicted.

• Align the holes and fasten

using (4) 12 x 0.625 (IHH)
screws.

A

B

STEP 4: Fastening Inner Duct and Duct Cross Channels (Items 5 & 7)

Hardware Required: (8) Screws, SMS (A) 12 x 0.625 (IHH)

(1) Duct Cross Channel
(1) Inner Duct Channel

Instructions: • Position the Inner Duct

Channel as depicted.

• Align the holes and fasten

using (4) 12 x 0.625 (IHH)
screws.

• Position the Duct Cross

Channel as depicted.

• Align the holes and fasten

using (4) 12 x 0.625 (IHH)
screws.

Outer Duct

Channel

Inner Cross

Channel

Supply

Side

IMPORTANT!

The following steps are for ductwork support. These steps are required only
if the ductwork will be installed prior to the ERV unit.

C

D

Duct Cross

Channel

Inner Duct

Channel

Supply

Side

Inner Cross

Length

Outer Duct

Length

A

B

ERV-522/90

23.50

58.60

22.13

25.25

ERV-582/120

34.50

74.00

35.75

36.25

All dimensions in inches.

Duct Cross

Length

Inner Duct

Length

C

D

ERV-522/90

22.13

36.50

27.70

12.75

ERV-582/120

35.75

38.12

32.25

13.00

All dimensions in inches.

This manual is related to the following products: