beautypg.com

Maintenance assembly and installation, Warranty – Greenheck Dock Arm Kit (475367) User Manual

Page 2

background image

2

IMPORTANT:
Maximum wattage for light fixture is 300 watt.
7. Plug fan into the outlet closest to the toggle switch

on the dock arm. Route the fan cord in a loop to
prevent pinching. Plug light into remaining outlet on
dock arm.

Maintenance

Assembly and Installation

Greenheck warrants this equipment to be free from defects in material and workmanship for a period of one year from the

shipment date. Any units or parts which prove to be defective during the warranty period will be replaced at our option

when returned to our factory, transportation prepaid. Motors are warranted by the motor manufacturer for a period of one

year. Should motors furnished by Greenheck prove defective during this period, they should be returned to the nearest

authorized motor service station. Greenheck will not be responsible for any removal or installation costs.

As a result of our commitment to continuous improvement, Greenheck reserves the right to change specifications without notice.

®

Phone: (715) 359-6171 • Fax: (715) 355-2399 • E-mail: [email protected] • Website: www.greenheck.com

Warranty

AMCA Publication 410-96, Safety Practices for Users and

Installers of Industrial and Commercial Fans, provides

additional safety information. This publication can be

obtained from AMCA International, Inc. at www.amca.org.

475367 • Dock Arm Kit Rev. 1, April 2012

Copyright 2012 © Greenheck Fan Corporation

WARNING

Installation and troubleshooting to be performed only
by qualified person(s).

NOTE:
The recommended location for the electrical outlet is
directly below the wall mount pivot bracket.
3. Mount the pivot bracket on the dock arm(A) to a

structurally adequate wall using (4) appropriate
fasteners (by others).

4. Raise the fan to the dock arm and insert the 1/2 x

3” bolt(E) and washer(D) through the ceiling mount
bracket and dock arm. Refer to Figure 1.

5. Add Z-Clip(C) and light fixture(B). Fasten with

washer(D) followed by nylok nut(F). Back off nut 1/4
turn to allow fan movement.

IMPORTANT:
Do not assemble without Z-Clip as this is designed to
prevent cord damage when rotating light.
6. Install flood lamp (by others). Depress the spring

loaded push-button in the back of the shade and
screw the lamp into socket until seated firmly. Slowly
release the push-button.

CAUTION

Support fan securely during assembly and installation.
1. Attach ceiling mount kit to the air circulator using

the instructions provided with the ceiling mount
accessory.

2. Locate the nearest wall stud for the desired

mounting location.

CAUTION

To reduce the risk of injury, disconnect and lockout
power source before servicing. Always unplug the
power cord.
1. Depending on the usage and severity, a regularly

scheduled inspection should be established.

2. Check for unusual noises when circulator is

running.

3. Periodically inspect and tighten all bolts, screws

and set screws.