beautypg.com

Unvented (vent-free) logmate™ firebox vanguard, Installation, Continued – Desa FB36NCA User Manual

Page 8: Built-in firebox installation, Mantel clearances for built-in installation

background image

8

103451

UNVENTED (VENT-FREE) LOGMATE™ FIREBOX

VANGUARD

1.

Frame in rough opening. The firebox
framing should be constructed of 2 x 4
lumber or heavier. Use dimensions in
Table 1 and rough opening layout in
Figure 8a. Adjust framing so that fire-
box flushes with finished wall surface.
If installing in a corner, use dimensions
in Figures 8b and 8c for rough opening.

2.

Install gas piping to firebox location.
See Installing Gas Line on page 10 and
Connecting to Gas Supply in log set
owners manual.

IMPORTANT:

If installing blower acces-

sory (Models FB36CA and FB42C), see
Hard-Wiring Firebox, page 10.

Figure 8 - Rough Opening for Installing in Wall

BUILT-IN FIREBOX
INSTALLATION

Built-in installation of this firebox involves
installing firebox into a framed-in enclo-
sure. This makes the front of firebox flush
with wall. Optional brass trim accessories
are available (see Accessories, page 13).
The brass trim will extend past sides of
firebox approximately 1/2 inch.This will
cover the rough edges of the wall opening.
If installing a mantel above the firebox, you
must follow the clearances shown in Figure
7. Follow the instructions below to install
the firebox in this manner.

FRONT WIDTH

DEPTH

MODEL #

(Inside to Inside)

HEIGHT

(Minimum)

FB36NCA

41

1

/

4

"

37"

20"

FB36CA

41

1

/

4

"

35

1

/

2

"

20"

FB42NC

47

1

/

4

"

37"

20"

FB42C

47

1

/

4

"

35

1

/

2

"

20"

ROUGH OPENING DIMENSIONS FOR BUILT-IN INSTALLATION

Depth

(Minimum)

Width

(Inside to Inside)

Height

TABLE 1

Figure 8a

36"

41-1/4"

50-29/32"

72"

45

°

TOP VIEW

FOR 36" MODELS
Height - 37" for FB36NCA

35 1/2" for FB36CA

55-5/32"

78"

39"

47-1/4"

45

°

TOP VIEW

FOR 42" MODELS
Height - 37" for FB42NCA

35 1/2" for FB42CA

Figure 8b

Figure 8c

INSTALLATION

Continued

Mantel Clearances for Built-In
Installation

If placing custom mantel above built-in
firebox, you must meet the minimum allow-
able clearance between mantel shelf and top
of firebox opening shown in Figure 7. These
are the minimum allowable mantel clear-
ances for a safe installation. Use larger clear-
ances wherever possible to minimize the
heating of objects and materials placed on
the mantel.

Figure 7 - Minimum Mantel Clearances for Built-In Installation

Firebox Hood
Must Be Used
at All Times

Wire-mesh
Screen

Firebox

Non-combustible Material
May Project Off this Surface
above the Firebox Hood

Mantel Shelf

13"

16"

19"

21"

2

1

/2

"

6"

8"

10"

,

,

,

Note:
All vertical measurements
are from top of fireplace
hood opening to bottom
of mantel shelf. All
measurements are in
inches.

Facing material (above
firebox) may be of
combustible material,
including decorative
mantel ornaments.

CAUTION: Do not allow the

vent-free gas log heater to touch
or extend beyond the fireplace
screen.

If your installation dies not meet the above
minimum clearances in Figure 7, you must:

• raise the mantel to an acceptable height,

OR

• remove the mantel.

This manual is related to the following products: