5
1
Flange PN 40, PN 63, PN 60, DN 50, DIN 250-
Flange PN 40, PN 63, PN 60, DN 00, DIN 250-
2
For the approval of the boiler standpipe the relevant regulations must be considered.
3
Vent hole
Provide bore as close as possible to the boiler wall!
4
High water HW
5
Electrode rod d = 8 mm
6
Protection tube DN 80
7
Protection tube DN 00
8
Electrode distance
≥
4 mm
9
Low water LW
0
Reducer DIN 266-2, K-88.9 x 3.2 – 42.4 x 2.6 W
Key
Wiring
NRG 1...-12
Note that screened four-core cable, e. g. I-Y(St)Y 2 x 2 x 0.8 or LIYCY 4 x 0.5 mm² is required for wiring
the electrode.
Max. length 00 m with conductivites from 0
µS/cm.
Max. length 30 m with conductivites from 0.5
µS/cm.
Max. length 5 m with conductivites from 0.5
µS/cm and application of the ancillary unit URN
(24 V DC).
. Unscrew screw
K
,
Fig. 10
2. Take the terminal box off the level electrode, leaving the sealing element
O
on the contact
plate
P
.
3. Remove lid
L
.
4. Press connecting plate
N
out of the upper part of the terminal box
M
.
The upper part of the terminal box can be turned in steps of 90°.
5. Detach cable gland
Q
and cable clamp
R
from the upper part of the terminal box
M
.
6. Run cable through cable gland
Q
and upper terminal box
M
and connect the terminals of the
connecting plate
N
according to the wiring diagram.
7. Press connecting plate
N
into the upper part of the terminal box and align the cable.
8. Hold cable with cable clamp
R
and cable gland
Q
in position.
9. Mount lid
L
and insert screw
K
.
0. Put upper part of the terminal box onto the level electrode and fix it firmly with screw