Technical Manual

DN8“ and 10“

DN 1“ - 3“ = square flange

DN 4“ and 6“ = hexagonal flange

Disassembly Instructions for AKH3

For all jobs which are to be carried out on an installed valve, the works safety requirements and

the general accident prevention instructions must be observed. Moreover, the general installation

and maintenance instructions for atomac fluorcarbon resin lined valves must be considered.

1. Prior to disassembly, the valve must be cleared of all fluid according to the above-mentioned

instructions. Particular care must be taken that during rinsing and draining of the piping, the

valve is opened and closed repeatedly. These cycles (opening and closing) are to be repea-

ted during draining of the piping. Only when following this procedure, is it ensured that all

remaining pressure inside the body (stem guide and ball seats) is eliminated.

Make sure that the valve DN 10“ is in open position when it is removed of the piping system.

2.

For disassembly of the valve, put body on a work bench with a soft cover (rubber mat). Re-

move hexagon bolt

(110) and lock washer (150).

3. Open valve completely. Remove hand lever.

4. Disassemble grounding device

(170).

5. Disassemble gland follower

(060) and gland insert (065). If necessary, stud bolts (120) can

also be removed now.

6. Remove body bolts

(080) and separate side piece from body.

7. Remove first ball seat ring

(030).

8. Put ball in closed position and push ball out of the body. Remove hand lever

(070).

9. Remove stem

(040) by pushing it down through the body (010). Care must be taken not to

damage body liner.

10. Chevron packing

(100) can easily be removed.

11. If necessary, remove hand lever stop

(210) by releasing bolt (220).