Flowserve LN User Manual
Page 14

LN, LNE, LNH, LNV, LNEV, LNC and LNEC USER INSTRUCTIONS ENGLISH 71576423 11-09
Page 14 of 32
flowserve.com
4.5.5 Final checks 
Check the tightness of all bolts in the suction and 
discharge pipe work. Check also the tightness of all 
foundation bolts. 
 
4.6 Final shaft alignment check
After connecting piping to the pump, rotate the shaft 
several times by hand to ensure there is no binding 
and all parts are free. 
 
Recheck the coupling alignment, as previously 
described, to ensure no pipe strain. If pipe strain 
exists, correct piping. 
 
4.7 Electrical connections
Electrical connections must be made
by a qualified Electrician in accordance with relevant 
local national and international regulations. 
It is important to be aware of the EUROPEAN
DIRECTIVE on potentially explosive areas where 
compliance with IEC60079-14 is an additional 
requirement for making electrical connections. 
Avoid mechanical, hydraulic or electrical
overload by using motor overload trips or a power 
monitor and make routine vibration monitoring. 
It is important to be aware of the EUROPEAN
DIRECTIVE on electromagnetic compatibility when 
wiring up and installing equipment on site. Attention 
must be paid to ensure that the techniques used during 
wiring/installation do not increase electromagnetic 
emissions or decrease the electromagnetic immunity of 
the equipment, wiring or any connected devices. If in 
any doubt contact Flowserve for advice. 
The motor must be wired up in
accordance with the motor manufacturer's 
instructions (normally supplied within the terminal 
box) including any temperature, earth leakage, 
current and other protective devices as appropriate. 
The identification nameplate should be checked to 
ensure the power supply is appropriate. 
A device to provide emergency stopping must
be fitted. 
 
If not supplied pre-wired to the pump unit, the 
controller/starter electrical details will also be supplied 
within the controller/starter. 
 
For electrical details on pump sets with controllers 
see the separate wiring diagram. 
See section 5.3, Direction of rotation
before connecting the motor to the electrical supply. 
 
4.8 Protection systems
The following protection systems are
recommended particularly if the pump is installed in a 
potentially explosive area or is handling a hazardous 
liquid. If in doubt consult Flowserve. 
 
If there is any possibility of the system allowing the 
pump to run against a closed valve or below 
minimum continuous safe flow a protection device 
should be installed to ensure the temperature of the 
liquid does not rise to an unsafe level. 
 
If there are any circumstances in which the system 
can allow the pump to run dry, or start up empty, a 
power monitor should be fitted to stop the pump or 
prevent it from being started. This is particularly 
relevant if the pump is handling a flammable liquid. 
 
If leakage of product from the pump or its associated 
sealing system can cause a hazard it is 
recommended that an appropriate leakage detection 
system is installed. 
 
To prevent excessive surface temperatures at 
bearings it is recommended that temperature or 
vibration monitoring are carried out. See sections 
5.7.4 and 5.7.5. 
 
If a defect of cooling can lead to temperature higher 
than those acceptable a system of cooling 
surveillance must be installed. 
Except when explicitly required by the customer in 
the specifications, when a possibility of reverse 
rotation exists the customer must install a reverse 
rotation protection device. 
The customer must install all equipment required to 
avoid water hammer. 
