beautypg.com

E&m configurations – FiberPlex TD-7280 User Manual

Page 16

background image

E&M Configurations 

Type II ‐ Two signaling nodes can be connected back‐to‐back. Type II uses four leads for supervision signaling: 
E, M, SB, and SG. During inactivity the E‐lead and the M‐lead are both open. The PBX indicates an off‐hook 
condition by connecting the M‐lead to the signal battery (SB) lead on the tie line equipment side. The router 
indicates an off‐hook condition by connecting the E‐lead to the signal ground (SG) lead on the trunk circuit 
side. 

 

Type III ‐ This is not commonly used in modern systems. Type III uses four leads for supervision signaling: E, M, 
SB, and SG. During inactivity the E‐lead is open and the M‐lead is connected to the signal ground (SG) lead on 
the tie line equipment side. The PBX indicates an off‐hook condition by disconnecting the M‐lead from the 
signal ground (SG) lead and connecting it to the signal battery (SB) lead on the tie line equipment side. The 
router indicates an off‐hook condition by connecting the E‐lead to ground on the trunk circuit side. 

 

 

 

 

Telephone Exchange

FOI(TD)-7280

FOI(TD)-7280

Carrier System

Current Detect

E Lead

SG Lead

M Lead

SB Lead

Voice TX

Voice RX

-48V

13&14

1&2

23

22

24

10

11

1&2

13&14

23

22

24

10

11

Fiber

Current Detect

E Lead

SG Lead

M Lead

SB Lead

Voice TX

Voice RX

-48V

Telephone Exchange

FOI(TD)-7280

FOI(TD)-7280

Carrier System

Current Detect

E Lead

SG Lead

M Lead

SB Lead

Voice TX

Voice RX

-48V

13&14

1&2

23

22

24

10

11

1&2

13&14

23

22

24

11

Fiber

Current Detect

E Lead

SG Lead

M Lead

SB Lead

Voice TX

Voice RX

-48V

This manual is related to the following products: