Rocedure, Direct heating system — new constructions, Direct heating system — reconstruction – Fenix ADSV User Manual

Page 9

background image

9

ROCEDURE:

Clean the base area, remove any sharp objects and penetrate it using a suitable penetrating solution.

Create “pockets” in the base material where you will place connections for the heating components.

Lay and affix the cable onto the surface so that it cannot move when you apply the sealing cement.

Measure the heating circuit resistance and the insulation resistance or the leakage current resistance

and record the values in the certificate of warranty.

Draw the scheme of the heating cable layout in the certificate of warranty.

Use flexible adhesive sealing cement and a notched spreader to smooth the floor surface (be careful

not to damage the cable by the sharp edge of the notched spreader).

Before laying the floor tiles, measure the heating circuit again and record both values in the certificate

of warranty.

Lay the floor tiles on the surface.



SECTIONAL VIEW OF THE FLOOR FOR PLACING CABLE INTO ADHESIVE SEALING CEMENT


Direct heating system — new constructions

















Direct heating system — reconstruction













1) Floor tiles
2) Flexible adhesive sealing cement
3) Installation pipe with a floor probe
4) ECOFLOOR heating cable
5) Spread layer
6) Reinforcing steel grid (KARI)
7) Thermal insulation 80–100 mm
8) Base


1) New floor tiles
2) Installation pipe with a floor probe
3) Flexible adhesive sealing cement
4) ECOFLOOR heating cable
5) Thermal insulation F-BOARD

(optional)

6) Flexible adhesive sealing cement
7) Original floor tiles or another base