Top track, hardware and hang standards, Mount the top track – Elfa Top Track and hang standards User Manual
Page 3

www.elfa.com
Sida 3 av 13
1
2
3
4
5
Top Track, Hardware and Hang Standards
Mount the Top Track
Top tracks have a top and a bottom. The TOP is
designated by a label and has two notches to
allow hang standards to be inserted properly.
Position the Top Track
Place top track at desired height, mark one hole in the
middle, and take the top track down. It is usually placed at
ceiling or door height, but may be placed at any height.
Begin drilling the marked hole with a 1/8”/3mm drill bit. If
you hit wood, continue drilling the entire length of the bit. If
you hit the hollow part of the wall, enlarge the hole with a
3/8”/10mm drill bit for the hollow wall anchors.
Put the top track up with one screw and tighten it
enough to hold the top track against the wall.
To keep the top track level while you mark all of
the holes, place a level on the top of the top track
and adjust it as required.
Drill all marked holes and put up the Top Track
Take the top track off of the wall. Drill holes with a 1/8”/3
mm drill bit, assuming you are going into wood. If you hit
wood, continue drilling the entire length of the bit. Put the
top track up and insert and tighten all the screws.
If you hit the hollow part of the wall, mark those holes with
an X, reminding yourself you need to go back and drill a
3/8”/10 mm hole for the hollow wall anchors.
Elfa Lumi AB
Elfagatan 5, 593 87 Västervik
Tel: +46 392-389 10 Fax: +46 392-361 25. E-mail: [email protected]