Installation

2-2

The footing recommendations are based on the allowable soil bearing pressure of 3000 psf
vertically and 300 psf/ft of depth horizontally. However, these recommendations are
suggestions only
and soil bearing pressure at the site must be determined by a sample test prior
to specifying actual footings. Be sure that the installation complies with local codes and is
suitable for the particular soil and wind conditions. Daktronics assumes no responsibility for
structures installed by others.
Daktronics recommends that W-sections of grade 35 steel be used
for beams, and that 28-day (strength 3000 psi) concrete be used for footings.

A note about beam nomenclature: For a typical beam, W6 x 12 for example "W" stands for
"Wide-Flange Beam". The first number (6) is the approximate front to rear dimension of the
beam in inches. The second number (12) is the weight per foot in pounds. This numbering is a
standard in the steel industry. Widths are from 6.00 to 8.00 inches in the chart above.



2.3 Display

Mounting

Reference Drawings: Display Splice Mounting .............................. Drawing A-51576

Display Mounting, CH-XX36H..................... Drawing A-51757


Drawing A-51757
shows the typical mounting for the display.

Note: The bolts that secure the display sections do not go through the beams, but run along
both sides of the beam to clamp the display to the beams.

A mounting kit consisting of 9 mounting angles 3 splice channels and 1/2" hardware are
provided to mount the display.

1. Position the display against the mounting beams and secure the bottom of the display to

both beams as shown in Drawing A-51757.

2. Next, secure the top of the display. Once mounting angles are attached, the display may

be slid up or down to the desired height.

3. Once positioned as desired, tighten all bolts.
4. Position the right display section next to the left display section and secure to the beam

the same way as the left display section was mounted.

5. Secure remaining mounting angles.
6. Attach the 3 splice channels at the top, bottom and center of the display where the two

display sections meet to secure the two sections together as shown in Drawing A-51756.


2.4 Electrical

Installation

2.4.1 Control Signal Cable

Reference Drawings: Pwr/Sig Entrance, 1 Driver Display.. Drawing A-46755

Color Code, 25-Pin J-Box ............... Drawing A-47207
Component Locations,CH-1036H ... Drawing A-51804


For the display, two conductors of 24 AWG are needed. For distances up to 600 ft. or
22 AWG, up to 1000 ft. are required. Daktronics has 24 AWG direct burial cable,
Daktronics part no. W-1105 with 6 conductors, and 22 AWG cable that must be
pulled through the conduit before burial, Daktronics part no. W-1077 with 2
conductors.