The station equipment shall be placed on dedicated AC line circuits. Observe
the following:
Redundant System
Customer shall provide separate circuits for Side A and Side B.
The AC line circuits shall be protected with circuit breakers and
integral ground protection, ligtning, and surge protector(s). An
uninterruptable power supply (UPS) and/or line conditioner is
recommended where power is subject to outages, surges, or
unstable or noisy conditions.
Table Top Installation of
the Operator’s
Workstation
Ther power receptacles shall be located at the equipment.
Equipment Rack
Installation
The length of the power cable shall be sufficient to terminate
inside the equipment rack.
RFI/EMI Protective
Measure
The indoor equipment shall be connected to a station ground.
Seaparate Utility Service
(AC) Power Outlets
Shall be provided at the indoor equipment locations for
installation hand tools and test equipment.
Power Consumption
Refer to the applicable Product Data Sheet.