Chp 2 indoor equipment, Indoor equipment, Workstations – Comtech EF Data MIDAS Site Preparation Requirements User Manual
Page 15: Operator workstation location
Site Preparation Requirements, Operator’s Guide, Rev.2
Indoor Equipment 2-1
2222
22222222
....
........
IIII
IIIIIIII
nnnn
nnnnnnnn
dddd
dddddddd
oooo
oooooooo
oooo
oooooooo
rrrr
rrrrrrrr
E
E
E
E
E
E
E
EE
E
E
E
qqqq
qqqqqqqq
uuuu
uuuuuuuu
iiii
iiiiiiii
pppp
pppppppp
m
m
m
m
m
m
m
m
m
m
m
m
eeee
eeeeeeee
nnnn
nnnnnnnn
tttt
tttttttt
I
I
n
n
d
d
o
o
o
o
r
r
E
E
q
q
u
u
i
i
p
p
m
m
e
e
n
n
t
t
Select a location for the indoor equipment that is away from the AC power-
generating equipment and other electromagnetic interference (EMI) and radio
frequency interference (RFI) sources such as an elevator or nearby radio
communications equipment.
W
W
o
o
r
r
k
k
s
s
t
t
a
a
t
t
i
i
o
o
n
n
s
s
O
O
p
p
e
e
r
r
a
a
t
t
o
o
r
r
W
W
o
o
r
r
k
k
s
s
t
t
a
a
t
t
i
i
o
o
n
n
L
L
o
o
c
c
a
a
t
t
i
i
o
o
n
n
The Operator Workstation and MIDAS Controller monitor can be placed upon
a table measuring 36 x 72 inches (91.44 x 182.88 cm), capable of supporting
equipment weighting 150 pounds (67.95 kg).
The Workstation needs direct access to the server for the Local Area Network
(LAN) cable connection. Standard cable length is 10 feet (30.5 m) maximum.
Alternately, the Operator Workstation can be placed upon an equipment shelf
within the equipment rack.