Planning for i, Unpacking, Preparation – Coloronix Adjustable 15-LED RGBW Flood Light User Manual
Page 6: Points to consider about data, Quick step-by-step instructions

Page 6 of 13 - Coloronix SS2 Direct Power Lighting Manual V.2.0.1
Planning for I
Planning for I
Planning for I
Planning for Installation
nstallation
nstallation
nstallation
Unpacking
The data enabler and trim are shipped assembled with no additional assembly needed.
Housing and trim are shipped in two different boxes.
Any optional accessories are included in the package. Use the packing list located on the
outside of the box to ensure all accessories are included.
Survey the unit to make sure the data enabler/trim are all intact—not cracked or
damaged. Any damages to the package or its contents are of the buyer’s responsibility;
please follow protocol for filing damage claims. Please recycle or appropriately discard of
any packing materials.
Preparation
Before Installation, Coloronix suggests:
• Consulting the provided submittal drawings to recognize layouts of luminaries,
power supplies, and wiring layouts.
• Drawing out a layout plan consisting of locations of luminaries and wiring.
• Record DMX addresses on a mapping grid for easy reference and addressing
(where applicable).
• An electrical inspector reviews all wiring plans.
Points to Consider About Data
•
Max power links is 9 per power feed
• AC Power and DATA cables may NOT run in the same conduit or within one
foot due to possible induced errors.
• 32 DMX DATA links max per run
Quick Step-by-Step Instructions
To successfully install RGBW Recessed Lighting, the steps are:
1. Mounting and alignment of fixture
2.
AC power connections
3.
DMX connections
4.
Ready to go.