Cb 9 series – Code Blue CB 9-S SIGNATURE SHORT ENCLOSURE User Manual
Page 18

Code Blue
•
259 Hedcor Street
•
Holland, MI 49423 USA
•
800.205.7186
•
www.codeblue.com
GU-159-D
page 18 of 38
CB 9 Series
Administrator Guide
13 CB 9 Series Tower Base Gasket Installation Instructions
1.0 FOUNDATION (see anchor bolt installation instructions)
2.0 SET THE UNIT
2.1 Screw one set of nuts and washers onto the anchor bolts. After the foundation
has set, screw one set of nuts, followed by one set of washers, onto the anchor
bolts. Set the nuts so the lowest washer is about 2½ inches above the concrete
at an even height.
To accomplish this, use a small level and check from front to back, side to side
and diagonally. These nuts are NOT adjustable after the unit is in place.
The bottom edge of the Code Blue unit will be ½-inch above the concrete when
installed.
2.2 Set the Code Blue unit on the anchor bolts. Align the phone plate in the
desired direction and lift the Code Blue unit over the anchor bolts. The
unit may be lifted using the bracket on the inside of the unit. Note that the unit
weighs approximately 200-400 pounds and that the 9 Series does not contain a
bracket on the inside of the unit. Use appropriate lifting materials and
methods to avoid possible injury and/or damage.
IMPORTANT: Leveling the bottom nuts is
crucial to leveling the unit. A small error will be
magnified after installation.
IMPORTANT: A ½-inch minimum air gap is
required between the foundation and the unit to
prevent moisture problems.