13 CB 9 Series Tower Base Gasket Installation Instructions

1.0 FOUNDATION (see anchor bolt installation instructions)

2.0 SET THE UNIT

2.1 Screw one set of nuts and washers onto the anchor bolts. After the foundation

has set, screw one set of nuts, followed by one set of washers, onto the anchor

bolts. Set the nuts so the lowest washer is about 2½ inches above the concrete

at an even height.

To accomplish this, use a small level and check from front to back, side to side

and diagonally. These nuts are NOT adjustable after the unit is in place.


The bottom edge of the Code Blue unit will be ½-inch above the concrete when

installed.






2.2
Set the Code Blue unit on the anchor bolts. Align the phone plate in the

desired direction and lift the Code Blue unit over the anchor bolts. The

unit may be lifted using the bracket on the inside of the unit. Note that the unit

weighs approximately 200-400 pounds and that the 9 Series does not contain a

bracket on the inside of the unit. Use appropriate lifting materials and

methods to avoid possible injury and/or damage.

IMPORTANT: Leveling the bottom nuts is
crucial to leveling the unit. A small error will be
magnified after installation.

IMPORTANT: A ½-inch minimum air gap is
required between the foundation and the unit to
prevent moisture problems.