Installation instructions, Planning your installation, Before you start – Caple ZC620 User Manual
Page 4
Planning Your Installation
INSTALLATION INSTRUCTIONS
Before You Start...
1.
Read this manual carefully and completely.
2.
The cooker hoods conform to related appliances standards. Please check your local building codes for any
additional requirements.
3.
The appliance has been manufactured as class I, there fore earthed connection is necessary. The cooker hood
must be installed so that the plug is easily accessible.
1. Measure the floor to ceiling height. This hood
can be installed on walls between 8” and 9” tall.
2. Find the centre point of your opening. Mark a
plumb line through this point from ceiling to your
range/cook-top.
3. Check your range/cook-top User Manual for the
minimum distance above your cooking surface.
The minimum distance between any element or
flame height and the nearest combustible surface
is 61cm (24”).
4. Decided where the ductwork will run between
the hood and the outside. Short, straight duct runs
will provide the most air flow.
5. If a recirculating kit is necessary, you may
purchase one through your dealer.
Unpacking
Remove the packaging with the product in place. Cut off the packing ribbons and carefully cut open the packaging
(do not cut too deeply), remove the packaging. Check that the product is free from transport damage. Any damage
shall be reported imme diately to the carrier or retailer. Damage, faults and missing parts must be reported
immediately to the retailer
Earthed
Outlet Box
Earthed
Outlet
Earthed Plug