beautypg.com

Installation instructions, Planning your installation, Before you start – Caple ZC620 User Manual

Page 4

background image

Planning Your Installation

INSTALLATION INSTRUCTIONS

Before You Start...

1.

Read this manual carefully and completely.

2.

The cooker hoods conform to related appliances standards. Please check your local building codes for any

additional requirements.

3.

The appliance has been manufactured as class I, there fore earthed connection is necessary. The cooker hood

must be installed so that the plug is easily accessible.

1. Measure the floor to ceiling height. This hood
can be installed on walls between 8” and 9” tall.

2. Find the centre point of your opening. Mark a
plumb line through this point from ceiling to your
range/cook-top.

3. Check your range/cook-top User Manual for the
minimum distance above your cooking surface.
The minimum distance between any element or
flame height and the nearest combustible surface
is 61cm (24”).

4. Decided where the ductwork will run between
the hood and the outside. Short, straight duct runs
will provide the most air flow.

5. If a recirculating kit is necessary, you may
purchase one through your dealer.

Unpacking

Remove the packaging with the product in place. Cut off the packing ribbons and carefully cut open the packaging
(do not cut too deeply), remove the packaging. Check that the product is free from transport damage. Any damage
shall be reported imme diately to the carrier or retailer. Damage, faults and missing parts must be reported
immediately to the retailer

Earthed

Outlet Box

Earthed

Outlet

Earthed Plug

This manual is related to the following products: