beautypg.com

Assembly – Brinly CC-560 BH Cultivator User Manual

Page 6

background image

1007076 Rev. A

6

3a. Assemble Tie Bars (5) to Frame Angles (4)

using 1/2" x 1-1/2" Bolts (10), 1/2" Lockwashers

(19), and 1/2" Nuts (15).

3b. Assemble Tie Bars (5) to Pull Bar (3) using

1/2" x 2" Bolt (11), 1/2" Lockwasher (19), and 1/2"

Nut (15).

3c. Tighten hardware from Step 2a.

4a. Assemble Spring Shanks (6) to Frame

Angles (4) using 1/2" x 1-1/2" Bolts (10), Special

Spacers (21), 1/2" Lockwashers (19), and 1/2"

Nuts (15).

Ensure Spring Shanks are set to run straight in

the direction of travel.

4b. When assembling for in-between row

cultivation, the extra Spring Shank will be

mounted in the center of the cultivator, using

the same hole and hardware used to fasten Tie

Bars (5) to Pull Bar (3), reference location (A) in

illustration.

Figure 3

Figure 4

FRAME TIE BAR ASSEMBLY

SPRING SHANK ASSEMBLY

ASSEMBLY

15

19

15

19

11

10

4

3

5

(10)

Bolt, 1/2" x 1-1/2"

Qty. 2

(10)

Bolt, 1/2" x 1-1/2"

Qty. 6

(11)

Bolt, 1/2" x 2"

Qty. 1

(19)

Lockwasher, 1/2"

Qty. 3

(19)

Lockwasher, 1/2"

Qty. 6

(15)

Nut, 1/2"

Qty. 3

(15)

Nut, 1/2"

Qty. 6

(21)

Special Spacer

Qty. 6 (or 7)

15

21

6

19

3

10

4

A

5