Step 16 step 17, Step 24, Step 25 – Blu Bathworks TEP431 User Manual
Page 15: Re-fit the processor cover
2013-12
1 866 907 0122 blubathworks.com
®
14
Step 24
Re-fit the processor cover.
Step 25
Displ
ay
15V
Battery
AN
Valve
Cont
16
DIGITAL WATER CONTROL AT YOUR FINGERTIPS
Connect the processor power lead to a double pole 3 amp
fuse switched spur incorporated in the fixed wiring circuit, in
accordance with the current wiring regulations.
Important: All showers requiring an electrical
connection MUST be installed by a qualified person
following the latest revision of BS 7671 (Wiring Regulations)
and certified to current building regulations.
Display
15V
Battery
AN
Valve
Cont
Step 16
Step 17
Connect an all-pole mains switch in the
electrical installation in accordance with
the current wiring regulations.
Note:
• the electrical installation and testing must be
carried out by a qualified electrician
• Electrical connections and the minimum
distances between water and electricity
connections must be installed or laid out in
accordance with the valid national regulations.
• Equipment for protection against faulty currents
must be installed (residual current circuit
breaker), N=30mA
• All work on the electronic components must be
only carried out under absence of voltage
Note: Damages to the faucet resulting from incorrect handling and installation are not covered in the manufacturer’s warranty.
Refit the control box cover.