beautypg.com

Step 16 step 17, Step 24, Step 25 – Blu Bathworks TEP431 User Manual

Page 15: Re-fit the processor cover

background image

2013-12

1 866 907 0122 blubathworks.com

®

14

Step 24

Re-fit the processor cover.

Step 25

Displ

ay

15V

Battery

AN

Valve

Cont

16

DIGITAL WATER CONTROL AT YOUR FINGERTIPS

Connect the processor power lead to a double pole 3 amp

fuse switched spur incorporated in the fixed wiring circuit, in

accordance with the current wiring regulations.

Important: All showers requiring an electrical

connection MUST be installed by a qualified person

following the latest revision of BS 7671 (Wiring Regulations)

and certified to current building regulations.

Display

15V

Battery

AN

Valve

Cont

Step 16

Step 17

Connect an all-pole mains switch in the
electrical installation in accordance with
the current wiring regulations.

Note:
• the electrical installation and testing must be

carried out by a qualified electrician

• Electrical connections and the minimum

distances between water and electricity
connections must be installed or laid out in
accordance with the valid national regulations.

• Equipment for protection against faulty currents

must be installed (residual current circuit
breaker), N=30mA

• All work on the electronic components must be

only carried out under absence of voltage

Note: Damages to the faucet resulting from incorrect handling and installation are not covered in the manufacturer’s warranty.

Refit the control box cover.

This manual is related to the following products: