General Instruction before Installation

IMPORTANT:

Ensure to check the bathtub for proper drainage before any draining is done.

• The bathtub is shipped with the waste and matching blu·stone

drain cover.

• Blu recommends that the tub be water tested before installation is complete. Fill the tub to overflow and inspect for

leaks.

• Decide exactly where you wish to install the bathtub and place the tub where it is to be installed and ensure the tub is

level. Note: Use 1½" (FIP) adaptor.

• Install the basic plumbing components: water inlet and waste. These tub models require a vertical plumbing

connection from the floor.

• Shims may be required to level the tub depending on finish floor surfaces. Shims are not included. When adjusting the

level allow a slight clearance (

8") between the finished floor and the apron. Note: use a level to ensure accuracy.

• Connect the bathtub drain to the waste. Hook up the water to the faucet. Check that all connections are waterproof.

NOTE:

The faucet cannot be installed on the bathtub. The tub filler must be mounted either in the wall or a freestanding

floor-mounted tubfiller. Read the manufacturer’s instructions for installation details.