beautypg.com

Connecting devices, Connecting cables, Check voltage rating and connect – BECKHOFF C6920 User Manual

Page 20

background image

Installation Instructions


Connecting devices

Power supply plug

Attention

The power supply plug must be withdrawn!

Please read the documentation for the external devices prior to
connecting them.

During thunderstorms, plug connector must neither be inserted nor
removed.

When disconnecting a plug connector, always handle it at the plug. Do not
pull the cable!


Connecting cables

The connections are located at the top of the Industrial PC and are
documented in the product description chapter.

When connecting the cables to the Industrial PC, proceed according to the
following sequence:

• Switch off all the devices that are to be connected.

• Disconnect all the devices that are to be connected from the power

supply.

• Connect all the cables between the Industrial PC and to the

devices that are to be connected.

• Connect all data transfer cables (if present) to the appropriate

plug-in receptacles of the data/telecommunication networks.

• Reconnect all devices to the power supply.

Check voltage rating and connect

Fitted with the 24 V

DC

power supply unit:

1. Check that the external power supply is providing the correct

voltage.

2. Insert the power supply cable that you have assembled into the

Industrial PC's power supply socket. Then connect it to your
external 24 V power supply.

Use same type of rechargeable battery

Attention

If a 24 V UPS is installed, the same type of rechargeable battery must be
used.

18

C6920/ 25