beautypg.com

Power supply connection, Pin assignment of the connector, Technical data – BECKHOFF CP65xx User Manual

Page 15: Connecting socket, Contact spacing

background image

Installation Instructions


Power Supply Connection

Supplied mains power unit The Industrial PC is fitted with a

• 100-240 V

AC

, 50-60 Hz power supply unit (standard) or

• with a 24 V

DC

power supply unit (Optional an uninterruptible power

supply (UPS) can be realized using the battery pack C9900-U330).

Danger

Danger of Explosion if using other battery packs!

Pin assignment of the connector

The 5-pin CAGE CLAMP plug connector and mounting flange illustrated is
located on the PC housing in order to connect the power supply.

Socket at the PC housing

Technical data

Connecting socket

Number of contacts

5

Contact spacing

5 mm

Minimum conductor cross-section

1.5

mm²

Minimum conductor cross-section

(AWG)

16

Rated voltage (EN)

250 V

Rated voltage (CSA)

300 V

Current EN [A]

12 A

Current CSA [A]

15 A

Length of stripped conductor

8 to 9 mm



Current carrying capacity of
the 100-240 V power
supply unit

Output voltages from

the 100-240 V power

supply unit

Current loading
maximum

+3,3 V

14 A

+5 V stand by

1,5 A

+5 V

16 A

-5 V

0,2 A

+12 V

9 A

-12 V

0,7 A


Current carrying capacity of
the 24 V power supply unit

Output voltages from

the 24 V power supply

unit

Current loading
maximum

+5 V

25 A

-5 V

1 A

+12 V

10 A

-12 V

1,5 A

CP65xx

13

This manual is related to the following products: