Equipment tray installation, Technical specifications, Quipment – TEKVOX CB1-A Ceiling Box User Manual
Page 9: Nstallation, Rawings

TEK CB1-A Plenum Rated Ceiling Box
9
Equipment Tray Installation
For ease of installation of equipment, a removable equipment tray comes attached to the
inside base of the ceiling case. The equipment tray can be easily removed by loosing the
four screws at the corners of tray and sliding the try. Additional mounting screws are
packaged separately within the ceiling cases. Installers may pre-wire the equipment tray
prior to the TEK CB1-A ceiling box installation.
The current equipment mounting holes
allow for placement of TEKVOX
equipment. Other equipment can easily
be installed by drilling a 1/8
” hole and
using the supplied mounting screws.
Thread-Forming Screws, Pan Head
Phillips, 8-18 Threaded, 1/4" Length. Do
not over tighten the mounting screws.
Technical Specifications
AGENCY APPROVALS
4008930
PLENUM RATED:
Conforms to UL 2043: UL Standard for Safety Fire Test for Heat and Visible Smoke Release
for Discrete Products and Accessories Installed in Air-Handling Spaces
SAFETY RATED:
Conforms to UL 60950-1: Information Technology Equipment - Safety and certified to CSA
22.2 60950-1: Safety of Information Technology Equipment
Model Number
78038
Size
23.75” x 14” x 5”
Weight
13 lbs
Gross Weight
50 lbs
Shipping Weight
17 lbs
Main Line Power
120V 60 Hz maximum 15 AmpsDrawings