Safety regulations, 1safety regulations – AXING SKS 4-00 User Manual
Page 3

© AXING AG – state of the art: June 2012 – Reserving change in design and type
Page 3
Safety regulations
SKS 4-00/4-01/8-01
SKS 4-00/4-01/8-01
1
Safety regulations
• Assembly, installation and service must be carried out by authorized and skilled electricians.
• Switch off facility operating voltage or pull out mains plug before starting assembly or service
work.
• Facility assembly:
In dust-free, dry environment, protected against humidity, vapors, splash water and moisture.
In a location protected against solar radiation. Not within close distance of heat sources. In
ambient temperature of <50°C.
• Ensure sufficient ventilation of the device. Do not cover the ventilation slots! - Avoid short
circuits!
• Damages arising from incorrect connection and/or improper operation are excluded from any
liability.
• Please observe all relevant standards, regulations and guidelines regarding installation and
operation of antenna facilities.
• Ground SAT earth stations using equipotential bonding rails according to EN 50083-1,
EN 60728-11:2010.
• Do not carry out any installation and service work during thunderstorms.