User operation guide – ABtUS AV502-S User Manual
Page 2
*Specifi cations are subject to changes without notice.
User Operation Guide
PACKAGING CONTENT
INSTALLATION
AV502-S Bracket - 1pc
Extension Bars - 4pcs
4pcs
8pcs
M6X12
Cross head
Pan Screw
1. For Concrete Wall -
Place Bracket at a desired height
and locattion. Mark and drill holes on
wall. Use Wall Anchors and Lag Bolts/
Washers provided to scure the Bracket.
2. For Stud Wooden Wall -
Place Bracket at a desired height and
location align at the Wooden Stud
position. Mark and drill a small hole.
Use Lag Bolts provided to secure the
Bracket.
3. for 200x200 VESA mounting
at least 2 person are required for this
installation. Lift the LED TV to the
Bracket front plate and align to the
mounting holes. Refer to the LED TV
manual for the correct size of screws
and secure the TV onto the Bracket.
M6X5
Cross head
Pan Screw
M6X15
Cross head
Pan Screw
Lag Bolt
M8X12
Cross head
Pan Screw
Plastic
Wall Anchor
M8X15
Cross head
Pan Screw
M6
Flat Washer
M6
Flat Washer
M8
Flat Washer
M8
Flat Washer
4pcs
8pcs
4pcs
2pcs
4pcs
2pcs
4pcs
2pcs
4pcs
QTY
QTY
Screw Bag -1
Screw Bag -1
Concrete Wall
Wall
anchors
Lag Bolts
Bracket
Lag Bolts (do not
use Wall Anchor
for wooden wall
installation
Wooden
Stud
Bracket
200 x 200 VESA
mounting holes
LED TV
Front
plate