beautypg.com

User operation guide – ABtUS AV508-WP1 User Manual

Page 2

background image

*Specifi cations are subject to changes without notice.

User Operation Guide

COMPONENT

MOUNTING

INSTALLATION

CABLE MANAGEMENT

Item 1
AV508-WP1 - 1pc

Item 2
Screw bag - 1 set

Item 3 -
3 Covers - 2 pcs

Step -1 (a)

Step-1(a) – Concrete Wall mounting – drill holes
and insert the Wall Anchors into the concrete wall.
Fix the Mount onto the wall with the Lag Bolts and
Washers provided.

Step-1(b) – Wood Stud mounting – use Stud
fi nder to locate the stud. Fix the Mount on the wall
with the Lag Bolts and Washers provided.
*Caution: Do not use Wall Anchors when
mounting onto Wood Stud !!

Step-2 – cover with Cover provided (Item-3)

Step -2

Front VESA plate
assembly

Push in

Hammer
Gently

Step -1 (b)

Step -3

screw A (x2)

screw B (x2)

Step -4

Step -5

OR cover from the front,
press cover until you hear a
“Click!” sound

3.4 Slide cover back
into arm after cables routed

3.2 Slide covers out
from the arms

3.1 Remove End Cap

3.3 Run cables

Step-3 – remove the Front VESA plate assembly
from the Mount. (Note: loosen and left screw-A
on the bracket, remove screw-B)

Step-4 – fi x the Front VESA plate assembly on
the Plasma.

Step-5 - Lift and lower the Plasma with the Front
VESA plate assembly onto the
Front arm of the mount. Tighten screw-A and B.