User operation guide – ABtUS AV509 User Manual
Page 2
*Specifi cations are subject to changes without notice.
User Operation Guide
PACKAGE CONTENTS
INSTALLATION
INSTALLATION
Item 1
Wall Arm - 1 set
Item 6
Wall Plate - 1 pc
Item 2 - Rotating
Adaptor - 1 set
Item 7
Hook - 2 pcs
Item 8
Lock Plate - 2 pcs
Item 9
Screw bag 3 - 1 set
Item 3 Adaptor
Plate - 1 set
Item 4 Screw Bag
1(in item 2) - 1 set
Item 4 Screw Bag
2 - 1 set
Step - 1 -Marks position of the Wall Plate mounting holes. Drill and insert Wall Anchors (in Item 5) into
concrete wall.
Note: do not use Wall Anchor for mounting on wooden wall.
Mount Wall Arm (Item 1) onto wall by using the Lag Bolts and Washers provided(in Item-5).
Step - 2 - Insert Rotating Adaptor(Item-2)
into Wall Arm short pipe. Secure with
M8X55 cap screws (in Item-4).
Step - 3 - Fix Adaptor Plate (Item-3) onto
Rotating Adaptor and secure with M8X65
cap screws (in Item-4).
Step - 4 - Fix Wall Plate(Item-6) onto Adaptor
Plate and secure with cap screws, washers and
hexagon nuts (in Item-4).
AV415W Packages
Step-1
Step-2
Step-3
Step-4
Step-5
Step-6
Markings
Holes for
concealed
cables
Lag bolts and
Washer
Push in
Hammer
Gently
Step-4
Step-2
Step-3
M8x55
Cap Screw
M8x65
Cap Screw
M5x8
Set Screw
Rotating Adaptor
Adaptor Plate
Wall Arm
Short Pipe