TracRac IM T-Rac Pro Toolbox Mount User Manual
Page 3

T-Rac ToolBox Mount Kit
INSTRUCTION MANUAL
3
TracRac Inc. 994 Jefferson Street, Fall River, MA 02721-4893 • 508-677-4130
3. There are two styles of toolbox mount clamps: front and rear. Cut two pieces of foam tape, 1-3/4” long and affix them to
the rear toolbox mounting clamps where shown (See figure 2).
4. Thread cap screws into clamps; fit U-Channel on end of each cap screw (See Figure 2). Slide the front clamp onto each
base rail. Next re-install and tighten the base rail clamps that were removed. Slide the rear clamp on the truck siderail.
Note: do not tighten the toolbox clamps. Position toolbox on clamps, making sure toolbox lid can open. Remove toolbox,
and tighten clamps into position. Note: Clamps on both sides should be equal distance along baserail (See Figure 3).
Figure 2. Clamp designation and
tape placement
Figure 3. ToolBox Placement
U-channel
Cap screw
Apply foam
to this surface
Front Clamp
Rear Clamp
Position so lid
can open
Side View
Top View
Position so lid can open
Rear toolbox clamp
Front toolbox clamp
Rear clamps equal distance
Front clamps equal distance