beautypg.com

OPTI-UPS DS20KBT User Manual

Page 20

background image

36

(1) 19” Rack installation:

Mount the 3U rack-mount in a 19-inch EIA 310 C standard rack.

(2) 23” Rack installation:

Change the position of the two mounting brackets to mount the 3U rack-mount in a
23-inch EIA 310 C standard rack.

19” rack width

23” rack width

37

(3) Tower installation:

a.

Move the mounting brackets from the front to the side and attach the brackets by
screws. Then let the UPS stand with the vertical direction as the below pictures
shown.

b.

Rotate the control panel unit from horizontal to vertical direction.

(4) Wall installation:

Move the mounting brackets from the front to the side and attach the brackets by
screws. Then mount the UPS to the wall as the below pictures shown.

This manual is related to the following products: