8 servicing – Glow-worm Hideaway 80CFF User Manual
Page 21
21
2000225006B
8.2 Boiler Flueways
Remove flueway baffles noting that there are 2 centre and 2
side flueway baffles, see diagram 8.8.
Place a sheet of paper in the combustion chamber to catch any
flue debris.
Thoroughly clean boiler flueways and fins with a suitable stiff
brush.
Replace in reverse order, after completing the relevant
instructions in sections 8.3 and 8.4.
8.3 Burner and Injector
Remove the two screws and nuts securing the burner support
bracket to the combustion chamber cover, see diagram 8.9.
Remove the graphite coated nuts on the supply feed pipe at the
rear of the burner to release the burner, see diagram 8.10.
Clean the burner. Use a vacuum cleaner or suitable stiff brush
(not wire) to clean the burner thoroughly, making sure that all
the burner ports are clear and unobstructed.
Check the burner injector for blockage or damage and replace
if necessary, see diagram 8.11.
With the burner removed the injector can be inspected and
cleaned as necessary.
For cleaning do not use a wire or sharp instrument on the hole.
If removed, use a little suitable sealant on the external thread
when refitting to make sure a gas tight seal is made.
Diagram 8.8
FLUEWAY
BAFFLE
HEAT
EXCHANGER
8 Servicing
SIDE
FLUEWAY
BAFFLE
HEAT
EXCHANGER
TOGGLE
LATCHES
FAN
Diagram 8.6
0886
WING NUT
SELF
TAPPING
SCREWS
(3)
Diagram 8.7
BOTTOM PLINTH
PANEL
BOTTOM PLINTH
PANEL