Read carefully before using – Glow-worm Betacom2 User Manual
Page 8

0020145066_01 - 02/12 - Glow-worm
- 6 -
READ CAREFULLY BEFORE USING
This appliance contains metal parts
(components) and care should be taken
when handling and cleaning, with
particular regard to edges.
• In the case of any water leak,
immediately turn off the cold water
supply to the appliance and have the
leak repaired by your competent person.
• Do not store or place articles on the
appliance.
4.3 Safety regulations
Servicing/maintenance should be carried
out by a competent person approved at the
time by the Health and Safety Executive,
in accordance with the rules in force in the
countries of destination.
If this boiler is installed in a rented property
in the UK there is a duty of care imposed
on the owner of the property by the current
issue of the Gas Safety (Installation and Use)
Regulations, Section 35.
Gas Safety (Installation and Use)
Regulations
In your own interests and that of safety, it is
the Law that ALL gas appliances have been
installed by a competent person approved
at the time by the Health and Safety
Executive, in accordance with the current
issue of these regulations.
Gas Category
This boiler is for use only on G20 natural
gas but can be converted for use on G31
propane.
Electrical Connection
The boiler MUST be earthed.
The boiler MUST be connected to a
permanent 230V ac, 50Hz supply, fused at
3A.
Connection of the whole electrical system
of the boiler, including any heating
controls, to the electrical supply must be
through one common isolator.
The colours of three core flexible cable
are, blue - neutral, brown - live, green and
yellow - earth.
Testing and Certification
This boiler is certificated to the current
issue of EN 483 for performance and safety.
It is important that no alteration is made to
the boiler unless approved, in writing, by
Glow-worm.
Any alteration not approved by Glow-worm,
could invalidate the certification, boiler
warranty and may also infringe the current
issue of the statutory requirements.
CE Mark
This boiler meets the requirements of
Statutory Instrument, No.3083 of the Boiler
(Efficiency Regulations, and therefore
is deemed to meet the requirements of
Directive 92/42/EEC on the efficiency
requirements for new hot water boilers fire
with liquid or gaseous fuels.
Type test for purposes of Regulation 5
certified by: Notified body 1312.
Product/production certified by: Notified
body 0086.
The CE mark on this appliance shows
compliance with:
- Directive 2009/142 EEC on the
approximation of the laws of the Member
States relating to appliances burning
gaseous fuels.
- Directive 2006/95/EEC on the
harmonisation of the Laws of the
Member States relating to electrical