East Coast Supercharging ECS Alky C6 User Manual
Page 12

Mount relay on inner fender. Route 12 gauge red wire using supplied loom through rear
of engine compartment. Route under brake booster and go through hole in firewall
where pump cable will go through.
3) Nozzle
The nozzle will be placed before throttle body. Install head of nozzle in the upper
portion of the air bridge 2 o’clock position on Mag cars or in the upper portion of the
pipe on supercharged applications. The installed height of the nozzle must be
higher than the tank. Else siphoning can occur. Simply drill 3/8 diameter hole into
location, feed nozzle in leaving one sealing washer on the inside.. tighten fitting on the
outside , then depending on thickness of material, install other washer on the outside.
Some applications require no washers with thick aluminum or silicone hose installs..
others require just one.. others both.. in the case of thin aluminum. Trick is to not
bottom nozzle out in the 90 degree elbow supplied. After nozzle is installed attach
supplied 1/8 pipe to –4 adapter. Clean area for debris, reinstall pipe. There is a supplied
check valve “IN CASE” siphoning occurs, whereby liquid flows when system is shut off.