Assembly – EarthQuake 9060300 User Manual
Page 9
9
Check for parts online at
www.getearthquake.com or call 800-345-6007 M-F 8-5
Operator’s Manual
Chipper Shredders
FIGURE 1 - Installing the Chipper Cone
A. Metal Cone Assembly
B. 5/18-18 Flange Nut
ASSEMBLY
Install Chipper Cone - All Models
1. Position the chipper cone (A) over the three 5/16-18
threaded studs protruding from the engine plate, and
attach using three 5/16-18 flange nuts (B). SEE FIGURE 1
2. Rotate cone and cone base away from engine so cone
does not contact engine.
3. Tighten the flange nuts securely.
Install the Hopper - All Models
1. Attach the hopper to the rotor housing. Make sure
to engage the metal lip of the hopper liner inside the
housing.
2. Secure the hopper to the rotor housing using two 5/16 x
1/2 hex head bolts, two 5/16 flat washers. Do not tighten
hardware at this time. SEE FIGURE 2
3. From the inside of the hopper install one 5/16-18 flange
nut on each 5/16 weld stud. Finger tighten only at this
time.
4. Check that the hopper is seated correctly and tighten all
hardware.
Install the Handle - All Models
1. Lift the hopper handle up until the outer holes in the
handle align with the holes in the shredder hopper
and secure with 1/4-20 x 3/4 screws, washers, and nuts
(A). Insert the screws from the outside of the shredder
hopper. SEE FIGURE 3
FIGURE 2 - Attaching the Hopper
14306-0008R1
A
FIGURE 3 - Installing the Hopper Handle
A.
1/4-20 x 3/4 Screw & Nut
14306-0006R1
A
B
14306-0007R1