beautypg.com

Warning – Dunkirk EW Empire II Series II User Manual

Page 4

background image

4

1.

Read the Owner’s Manual for Safe Operation. Failure

to follow rules for safe operation and instructions can

cause malfunction of boiler and result in death, serious

bodily injury, and/or property damage.

2.

Check your local codes and utility requirements before

installation. Installation must be in accordance with

their directives, or follow NFPA 31 Installation of Oil

Burning Equipment, latest revision.

3.

Before servicing, allow boiler to cool. Always shut off

any electricity and oil to boiler when working on it.

4.

Inspect oil line and connections for leaks.

5.

Be certain oil burner nozzle is the size required. Over-

firing will result in early failure of the boiler sections.

This will cause dangerous operation.

6.

Never vent this boiler into enclosed space. Always vent

to outside. Never vent to another room or inside a

building.

7.

Be sure there is adequate air supply for complete

combustion.

8.

Follow regular service and maintenance schedule for

efficient and safe operation.

9.

Keep boiler area clean and free of combustible material,

gasoline and other flammable vapors and liquids.

10.

Oil burners are not do-it-yourself items. This

boiler must be installed and serviced by qualified

professionals using combustion test instruments.

WARNING

Burn and scald hazard. Safety relief valve could

discharge steam or hot water during operation.

Install discharge piping per these instructions.

!

11.

Be aware when piping the safety relief valve if system

pressure exceeds safe limit of 30 pounds per square

inch, the safety relief valve will automatically lift

open. Lifting of the safety relief valve can discharge

large quantities of steam and hot water, which may

damage the surroundings. Before installing the safety

relief valve read the manufacturer’s instructions and

maintenance section of the manual on safety relief

valves.

12.

Installation and sizing of the expansion tank must

consider heating systems total water volume,

temperature, boiler initial fill pressure, and system

arrangement. Improperly installed and sized expansion

tank may result in frequent lifting of the safety

relief valve or other heating system problems. For

proper installation, sizing, and maintenance of the

expansion tank follow guidelines established by tank

manufacturer.

13.

Expansion tank performance and life expectancy can

be hindered by overfilling the boiler. Recommend initial

fill pressure of 10-12 psig. For higher fill pressures

expansion tank’s air charge will need to be increased to

match fill pressure. Consult manufacturer’s guidelines

for sizing and selection.

14.

Purging the heating system of air and gases when

first putting boiler into service is critical for proper

circulation and quiet performance. Once air and gases

are purged, for boiler installations using float type

vents, air vents should be closed for normal operation.

If air is heard or noticed by loss of heat, purge system

and open vents for short period of time.

SAFE INSTALLATION AND OPERATION

NOTICE

This boiler has been designed for residential

installations. If used for commercial applications,

all jurisdictional requirements must be met. This

may require wiring and/or piping modifications.

Manufacturer is not responsible for any changes to

the original design.

DO NOT USE GASOLINE CRANKCASE DRAININGS

OR ANY OIL CONTAINING GASOLINE.