beautypg.com

Warning – Dunkirk EW Empire II Series II User Manual

Page 26

background image

26

WARNING

Electrical shock hazard. Turn OFF electrical power supply

at service panel before making electrical connections.

Failure to do so could result in death or serious injury.

!

1.

Verify all electrical power to boiler / burner and fuel

supply to burner are shut off.

2.

With swing door open, clean any soot accumulations

from end of burner and if applicable burner head.

3.

Remove burner drawer assembly, clean electrodes

and then reset electrode spark gap per manufacturer’s

recommendations.

4.

Replace oil nozzle with same size and type

recommended for use on this boiler.

5.

Install burner drawer assembly make sure head

location (and size if applicable) are per manufacturer’s

recommendations. If burner being used has damaged

head, replace head with same head recommended for

use on this boiler.

6.

Inspect and clean oil burner blower wheel.

7.

Remove oil pump cover and clean / replace pump

screen. Carefully reassemble insuring pump cover

creates proper seal.

8.

Securely fasten swing door shut.

9.

Replace fuel filter (if applicable).

10.

Connect electrical and fuel supplies.

11.

Fire burner, check for proper combustion using

combustion test equipment and making adjustments as

necessary.

12.

Insure all safety controls and operating controls are

functioning properly.

These are general instructions for cleaning

an oil burner. For specifics, consult burner

manufacturer’s instructions.

OIL BURNER CLEANING