Planning
CMW
Planning
1.
Gather information about jobsite. See page 70.
2.
3.
Classify jobsite. See page 72.
4.
Select chain and teeth to match your soil type, if necessary. See page 140
5.
Check supplies and prepare equipment. See page 74.
6.
Haul equipment to jobsite. See page 88.
Trenching
1.
2.
Position tractor and controls. See page 94.
3.
4.
Engage cruise control if desired. See page 138.
5.
Complete the installation. See page 99.
6.
Shut down tractor. See page 80.
Plowing
1.
2.
Position tractor and controls. See page 102.
•
•
coordinated plowing - page 109
•
3.
4.
5.
Engage cruise control if desired. See page 138.
6.
Complete the installation. See page 108.
7.
Shut down tractor. See page 80.