Pump fluid to boring unit – Ditch Witch FT5 User Manual
Page 23
FT5 - OPERATION
23
PUMP FLUID TO BORING UNIT
PUMP FLUID TO BORING UNIT
Electric shock. Contacting electric
lines will cause death or serious injury. Know
location of lines and stay away.
NOTICE: If electrical strike occurs while fluid hose is connected
to boring unit, fluid system also will become electrified.
1.
Connect hose from mixing pump to boring unit.
2.
Open discharge valve and adjust engine throttle to give
desired flow rate to boring unit (approximately half throttle).
IMPORTANT: If using bentonite in fluid mixture, leave
circulation valve approximately half open to allow continuous
mixing while boring.
A higher throttle setting is necessary if recirculating fluid
through the pump.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)