Setup, Check equipment – Ditch Witch FT5 User Manual
Page 17
FT5 - SETUP
17
CHECK EQUIPMENT
SETUP
CHECK EQUIPMENT
Check the following before each day’s work. Refer to
LUBRICATION AND MAINTENANCE for additional information
and locations.
•
General appearance of equipment.
•
Safety sign location and readability.
•
All guard and shield locations. Replace if missing or worn.
•
Condition of all wear items such as filters, hoses, and clamps.
•
Drilling fluid hoses and electric cables for signs of leakage,
wear, or other damage.
•
Engine crankcase oil level. Keep oil level at the highest line on
dipstick. Do not overfill.
•
Fuel level. Fuel tank should be filled at the end of the day to
reduce condensation.
•
All nuts and bolts. Tighten if necessary.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)