Lift, Points, Procedure – Ditch Witch MR90 User Manual
Page 49: Mr90 operator’s manual

Transport - 48
MR90 Operator’s Manual
Lift
CMW
®
Lift
Points
Lifting points are identified by lifting decals. Lifting at other points is unsafe
and can damage machinery.
Procedure
Tank
Use crane capable of supporting the equipment's
size and weight. See “Specifications” on page 103
or measure and weigh equipment before lifting. Lift
mixing tank by attaching lifting devices at lift points
and joining at a common lift points.
Power Unit
Use crane capable of supporting the equipment's
size and weight. See “Specifications” on page 103
or measure and weigh equipment before lifting. Lift
power unit by attaching lifting device at lift point.
Crushing weight. If load falls or moves it could kill or crush
you. Use proper procedures and equipment or stay away.
IMPORTANT: Empty tank before lifting.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)