Dillon Precision Square Deal 'B' User Manual
Page 9
Fig. 10 – The powder measure is held in place by the
collar clamp (#13986). Tighten in place, but do not over
tighten.
Fig. 11 & 12 – Installation of the Powder Measure
Failsafe System.
To install the failsafe rod (#16814) remove the blue
stripper wingnut (#13799), rod spring (#14033) and
washer (#18086). (Note the order of parts.) See Fig. 11
Insert the bottom end of the rod between the bench
and the Square Deal “B” through the hole in the return
bracket (#13355). Then, using your thumb and index
finger of your right hand, move the lock-link (#17838)
down to align the hole with the slot on the Powder
Measure bellcrank (#17839). Next, insert the failsafe rod
(#16814) through the two holes and insert the failsafe rod
clip (#13840).
Install the washer (#14033) and the wingnut (#13799).
With your left hand, move the operating handle (#20114)
to the priming position; press the operating handle firmly
forward and with your right hand adjust the wingnut until
the spring is partially compressed. You are now ready to
reload. Refer to the rear view in Fig. 11 to assist in the rod
location and proper powder measure positioning.
Check It Out
Your assembly should now be complete, but before
you stock it with powder and primers let’s run through the
operation a few times.
Your Square Deal “B” has been adjusted at the factory
in the caliber of your choice and we’ve enclosed the
sample rounds that we used to obtain those adjustments.
One cartridge has a bullet seated to illustrate the seating
depth and the other round was primed (the primer is
inert).
Place the cartridge case without the bullet in Station 1
Fig. 11
Fig. 12
Fig. 10
9
May 2007 Square Deal B Manual 5/17/07 2:23 PM Page 9