Dillon Precision Square Deal 'B' User Manual
Page 7
Ready? Let’s Set Up
Carefully remove your new Square Deal “B” from its
packaging. Set the small parts aside.
Fig. 1 – Install the ejected cartridge chute bracket
(#13659) with two large screws (#13976) from the parts
bag.
Fig. 2 – Using the machine itself as a template, mark
the three mounting holes. Allow about one foot on both
sides of your Square Deal “B” for working room. Make
sure your bench is sturdy and does not shake, as this may
disturb your powder charge and primer system.
Fig. 3 – Drill the mounting holes and secure the
Square Deal “B” to your bench, using 1/4" bolts (not
supplied).
Fig. 4 – Install the spent primer cup/return bracket
(#17212) on the bottom of the shaft (#13437). The spent
primer cup (#16211) simply slides onto the rails of the
bracket.
Fig. 3
Fig. 4
7
Fig. 1
16211
17212
Fig. 2
May 2007 Square Deal B Manual 5/17/07 2:23 PM Page 7