Bonaire H2 Optimiser User Manual
Page 3

I
NSTALLATION
/
M
AINTENANCE
I
NSTRUCTIONS
H
2
Optimiser
Installation
The Integra unit comes with most of the H
2
Optimiser components already
installed.
•
The CARE-FREE Water Conditioner A/C 6 is installed in the water
distribution circuit.
•
The water outlet solenoid and overflow fitting have been installed and the
wiring loom is connected to the control board.
•
The water inlet valve loom has been connected to the control board.
Installation Requirements
•
Install the water inlet solenoid valve onto the ball float valve using the
90° elbow provided.
•
Connect the flexible connector to the inlet solenoid valve.
•
Connect the solenoid wiring loom to the inlet solenoid valve terminals.
•
Connect the flexible connector to the mains water.
Refer to the unit installation instructions for all other installation requirements.
H
2
Optimiser Operation
The H
2
Optimiser has 2 functional areas:
•
The water outlet solenoid is part of the water distribution circuit. Once the
hour counter setting has been met, the inlet valve will close and the water
outlet valve will open allowing the sump water to be pumped out of the unit
for a period of 3 minutes. The water outlet solenoid will then close, the
water inlet valve will open and normal operation will be resumed. If there
has been no activity of the unit for 30 days since last usage, the unit will
pump out the sump water upon unit reactivation
•
The CARE-FREE Water Conditioner A/C 6 generates its own current once
it has been fully submersed in the water reservoir.
Page 3