Ductwork, Site, Customer hand over – Bonaire Deluxe Control (LV) - PNE User Manual
Page 13: Site customer hand over

Manual Comfort Control
Control Installation & Setup
PNE2002 Series Control
Page 13
Ductwork
All ductwork is completed to plan, correctly supported and airtight, with no bend less than 1.5 x the
ductwork diameter.
Air distribution checked, dampers are adjusted and all outlets correctly adjusted and wiped clean.
All roof penetrations are fully sealed and watertight.
Man hole cover replaced.
Site
All rubbish has been removed from inside and on the roof.
Customer Hand Over
The operation of the Controller.
The need to open windows and doors for the correct operation of Fresh Air Conditioning
The operation of the bleed or dumping system and it’s importance to operate all the time in ducted
fresh air conditioning
Maintenance requirements