24 volt thermostat wiring, Thermostat diagram, General – Adams Condensing Oil-Fired Furnace User Manual
Page 15
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

I
WARNING
HIGH VOLTAGE!
TO AVOID THE RISK OF INJURY,
ELECTRICAL SHOCK OR DEATH, THE
FURNACE MUST BE ELECTRICALLY
GROUNDED IN ACCORDANCE WITH
LOCAL CODES OR IN THEIR
ABSENCE, WITH THE LATEST
EDITION OF THE NATIONAL
ELECTRIC CODE.
To ensure proper unit grounding, the ground
wire should run from the furnace ground
screw located inside the furnace junction
box all the way back to the electrical panel.
NOTE:
Do not use oil piping as an
electrical ground. To confirm proper unit
grounding, turn off the electrical power and
perform the following check:
1.
Measure resistance between the
neutral (white) connection and a
suitable chassis ground.
2.
Resistance should measure 10 ohms or
less.
This furnace is equipped with a blower door
interlock switch which interrupts unit voltage
when the blower door is opened for
servicing. Do not defeat this switch.
24 Volt Thermostat Wiring
NOTE:
Wire routing must not interfere with
circulator blower operation, filter removal, or
routine maintenance.
Low voltage connections can be made
through either the right or left side panel.
Thermostat wiring entrance holes are
located adjacent to the junction box
locations in the blower compartment.
Thermostat Diagram
This furnace is equipped with a 40 VA
transformer to facilitate use with most
cooling equipment. Consult the wiring
diagram, located on the blower
compartment door, for further details, of 115
Volt and 24 Volt wiring.
VIII. CONDENSATE DRAIN LINES
& DRAIN TRAP
GENERAL
A condensing oil-ftred furnace achieves its
high level of efficiency by extracting almost
all of the heat from the products of
combustion and cooling them to the point
where condensation takes place.
The condensate which is generated must
be piped to an appropriate drain location.
The furnace’s drain hoses may exit either
the right or left side of the furnace.
in horizontal installations, the drain hoses
will exit through the bottom (down side) of
the unit with the drain trap su^nded
beneath the furnace.
The field'Supplied drain system must be in
accordance with all local codes and the
instructions in the following sections.
Follow the instructions below when installing
the drain system.
Refer to the following sections for specific
details concerning furnace drain trap
installation and drain hose hook ups.
The drain trap supplied with the furnace
must be used.
DRAIN TRAP ASSEMBLY
Check for proper fit of the entire assembly
Before cementing the individual
components together. Place the flexible
pipe coupling on the sub protruding from the
90 degree elbow connected to the
condensate collector, then insert the 6 inch
pipe stub and tighten the clamps on each
end of the flexible coupling.
Attach the tee to the stub coming out of the
furnace and insert 10 inch stub to bottom of
the tee. Attach the trap assembly to the
bottom of the stub using PVC pipe coupling.
Do Not
use
pipe cement on the flexible
pipe coupling.
Add water to the trap until
some runs out of the drain overflow. Do not
install the drain in areas subject to freezing.
DRAIN CONNECTION
Insert the Yt inch ID tubing through the hole
in the cabinet and press on to the barb
fitting.
Do not
use
excessive force
on the drain pan.
Connect the other end to
the top 90 degree barb on the drain trap
assembly. Connect another piece of tubing
to the bottom of the tee on the drain trap
and run to the condensate neutralizer. The
condensate neutralizer must lay in a
horizontal position. Connect installer
furnished tubing (type UVT or equivalent,
Yt" ID) to the other end of the condensate
neutralizer and run to a drain. Do not install
the drain in areas subject to freezing.
14