beautypg.com

Pre-assembly, Assembly instructions, Eszhimgsssbss) – MTD 249-690A User Manual

Page 4

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

PRE-ASSEMBLY

NOTE

The right and left side of your Leaf

Blower is determined from operator's
position.

Before any step is undertaken, the instructions for

that step should be read through.

TOOLS REQUIRED:

A.

(1) 5/16" wrench

B.

(1) 3/8" wrench

C.

(2) 1/2" wrenches

MATERIALS REQUIRED:

1. Funnel (for gas and oil—NOTE: Do not mix).

2. S.A.E. 30 Oil-1-1/4 pints.

3.

Gas (regular).

4.

Cleaning rag.

PARTS IN CARTON

NOTE

The letters listed below will be referred
to throughout the following text for
easier hardware identification.

LIST OF CONTENTS IN HARDWARE PACK:

(See figure 2)

A.

(2)

Hand Knobs

B.

(2)

Curved Head Bolts

C.

(2)

Hex Screws 5/16-18 x 1.25" Lg.

D.

(2)

Lockwashers for 5/16" Bolts

E.

(2)

Hex Nuts 5/16-18 Thread

F.

(5)

Wing Nuts

G.

(5)

Flat Washers

H.

(2)

Hex Screws #10-32 x 1.25" Lg.

1.

(2)

Hex Lock Nuts #10-32 Thread

J.

(1)

Carriage Bolt 1/4-20 x .62" Lg.

K.

(1)

Cable Tie

!

H

m

t'

eszHimgsssBSS)

FIGURE 2

FIGURE 1

ASSEMBLY INSTRUCTIONS

1.

Remove the Leaf Blower, parts pack and all

4

literature from the carton before discarding carton.

This manual is related to the following products: