INSTALLATION CHECK LIST
LOCATION AND SUPPORT
___1. The generator is properly located.
___2. The generator is properly supported.
___3. The generator is properly restrained.
COMPARTMENT
___1. Compartment construction is proper.
___2. Holes/openings are vapor-sealed.
___3. Compartment size is correct.
___4. Compartment is vapor-sealed.
___5. Sound insulation is O.K.
___6. Floor cutouts property completed.
COOLING and VENTILATING AIR
_1. Air flow is adequate.
_2. Air inlet opening is correct.
_3. Compensate for restrictions
4. Installation has been tested
GASOLINE FUEL SYSTEM
___1. Fuel tank complies with code.
___2. Fuel system properly installed.
OPTIONAL PROPANE GAS SYSTEM
___1. System is properly installed.
___2. Correct pressure at regulator inlet.
___3. Rated flow of primary regulator is O.K.
___4. All parts are properly installed.
___5. System was properly tested for leaks.
___6. System properly tested/adjusted.
ELECTRICAL CONNECTIONS____________
___1. Comply with code requirements.
___2. Junction box properly installed.
___3. Wiring meets all standards.
___4. All connections are correct.
___5. Conduit properly installed and sealed.
___6. Generator properly bonded to vehicle.
BATTERY INSTALLATION_____________
___1. Recommended battery is installed.
___2. Recommended cables are installed.
___3. Cables are clean and tight.
___4. Cables are properly connected.
___5. Proper ventilation is provided.
EXHAUST SYSTEM
POST INSTALLATION TESTS
___1. Complies with code requirements.
___2. Properly and safely installed.
___1. All tests properly completed.
—