beautypg.com

Assembly / pre-operation – Husqvarna 10527STE User Manual

Page 7

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

ASSEMBLY / PRE-OPERATION

INSTALL DISCHARGE CHUTE/CHUTE ROTATER HEAD
(See Fig. 7)

NOTE: The multi-wrench provided in your parts bag may
be used to install the chute rotater head.

1. Place discharge chute assembly on top of chute base

with discharge opening toward front of snow thrower.

2. Position chute rotater head over chute bracket, if nec­

essary, rotate chute assembly to align square and pin
on underside of chute rotater head with holes in chute
bracket.

3.

With chute rotater head and chute bracket aligned,

position chute rotater head on pin and threaded stud
of mounting bracket.

4. Install 3/8 washer and locknut on threaded stud and

tighten securely.

INSTALL CHUTE DEFLECTOR REMOTE CONTROL
(See Figs. 8 and 9)

1.

Install remote cable bracket to discharge chute with

5/16-18 carriage bolt, 5/16 flat washer and 5/16-18
locknut as shown. Tighten securely.

2.

Install remote cable eyelet to chute deflector with

1/4-20 shoulder bolt, nylon friction washer and 1/4-20

locknut as shown. Tighten securely.

3. Install spring hooks between hex nuts on chute rotater

head and into hole in chute deflector as shown.

CHUTE
DEFLECTOR

NYLON

FRICTION

WASHER

CABLE
EYELET

1/4-20
LOCK.
NUT

SPRING

1/4-20

.SHOULDER

BOLT

HOOK BETWEEN

HEX NUTS

ON CHUTE

ROTATER HEAD

S/16-18

CARRIAGE

BOLT

5/16 FLAT

/ WASHER

5/16-18
LOCKNUT

FIG. 8

CHECK TIRE PRESSURE

The tires on your snow thrower were overinflated at the fac­
tory for shipping purposes. Correct and equal tire pressure

is important for best snow throwing performance.

• Reduce tire pressure to 14-17 PSI.