beautypg.com

Remove snow thrower from carton, Howto set up your snow thrower, Assembly / pre-operation – Husqvarna 10527STE User Manual

Page 5

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

ASSEMBLY / PRE-OPERATION

Read these instructions and this manual in its entirety before you attempt to assemble or operate your new snow thrower.

Your new snow thrower has been assembled at the factory with the exception of those parts left unassembled for shipping
purposes. Al! parts such as nuts, washers, bolts, etc., necessary to complete the assembly have been placed in the parts
bag. To ensure safe and proper operation of your snow thrower, al! parts and hardware you assemble must be tightened
securely. Use the correct tools as necessary to ensure proper tightness.

REMOVE SNOW THROWER FROM CARTON

1. Remove al! accessible loose parts and parts boxes

from carton.

2. Cut down all four corners of carton and lay panels

flat.

3. Remove al I packi ng mate rial s except plastic tie holdi ng

speed control rod to lower handle.

4. Remove snow thrower from carton and check carton

thoroughly for additional loose parts.

HOWTO SET UP YOUR SNOW THROWER

TOOL BOX {See Fig. 10)

A toolbox is provided on your snow thrower. The toolbox
is located on top of the belt cover. Store the extra shear
bolts, nuts and multi-wrench provided in parts bag in the
toolbox.

NOTE: The multi-wrench may be used for assembly of the
chute rotator head tosnowthrowerand making adjustments
to the skid plates.

UNFOLD UPPER HANDLE

1. Raise upperhandletotheoperatingpositionandtighten

handle knobs securely.

INSTALL SPEED CONTROL ROD (See Figs. 1 and 2)

1. Remove plastic tie securing rod to lower handle.

2. Insert rod into speed control bracket and secure with

retainer spring.