Proper fuel line material, and size.
All fuel line connections tight.
Fuel line protected and a moisture trap installed
(may be required for N.G.).
LP/NG pressure O.K. 4-6 Oz. (7-11" WC).
Battery connections clean and tight.
Battery fully charged.
All A.C. and D.C. wiring installed and properly

protected.

* Refer to engine owners manual for proper
levels and type.

After completing the above checklist, the engine-

generator set is ready for the initial start-up test.

PROCEDURE

Engine Generator Set only

Move the right hand toggle switch from stop to the

normal position the alarm light should go out. Next move
the left hand toggle switch from the off to the run position.
You should hear the fuel solenoid engage at this time.
Next lift the toggle switch to the start position and hold.
The starter should engage and the engine will start. As
soon as the engine starts release the toggle switch and it
will return to the run position. If the engine does not start
after 15 seconds release the switch and let the starter rest
for 15 seconds and reattempt to start. If the unit still will
not start, consult the troubleshooting guide in the back of
this manual.

With the engine running smoothly, check the no load

voltage and frequency at wire #1 and #4 (L2 and L6 in the
ASCO ATS) on the generator terminal block in the A.T.S.
The voltage should be 240 volts plus or minus nominal.
The frequency should be between 61.5 to 62 hertz (Hz).
The voltage should also be checked between the hot
terminals (L2 and L6) and the neutral to be certain of a
balanced voltage output and a solid neutral connection.
The voltage should be about one half of the line to line
voltage.

** Notice **

If for any reason during the check out procedure the
voltage and frequency are not correct, move the toggle
switch to the “STOP” position and correct the trouble
before proceeding.

After verifying the voltage and frequency are correct,

move the left hand toggle switch to the off position. The
unit should shut off with no time delay. Move the right
hand toggle switch to the stop position, the alarm light
should now light up.

Transfer Switch & Engine Generator

This procedure checks the electrical operation of

automatic transfer switch. If the actual operation does not
follow this procedure, consult the troubleshooting section
in the transfer switch manual.

1. Move the right hand toggle switch from the stop
position to the normal position, the alam light should
go out. The unit is now ready to be operated from the
Automatic Transfer Switch.

*************
***** WARNING *****
*************

PERSONAL INJURY HAZARD -

Install front cover in

transfer switch before operation. An electrical system
fault could cause a flash and severe personal injury

2. Turn on the preferred source (utility) circuit breaker.
The utility source acceptable light should now come on
as well as the transfer switch on utility light. If these
lights fail to come on recheck your incoming power to
insure you 240 volts nominal. If not troubleshoot you
utility source before continuing.

3. Turn on the alternate source (generator) circuit
breaker.

4. Press and hold the Push to Test button until the
generator (alternate source) acceptable light come one
and stays on. Then release the button. This will start
your generator set up.

This light indicates that the generator is running and
the output voltage and frequency are within acceptable
limits. Under normal conditions this light should come
on in 5 to 10 seconds. If the light does not come on
and stay on a malfunction has occurred. Either the
unit didn’t start or the voltage or frequency is incorrect.
Correct the problem before continuing.

5. About 15 seconds after the generator (alternate
source) acceptable light comes on , the automatic
transfer switch should transfer the load from the utility
to the generator. At that time the Transfer Switch on
generator light should come on.

6. The generator will stay connected to the load for
about 5 minutes at which time the transfer switch will
transfer the load back to the utility. At the time it
transfers back to utility the Transfer Switch on Utility
light should come on and the Transfer Switch on